Services / CE marking for machinery
CE marking under the Machinery Directive for machines and lifting equipment
For machine builders and makers of lifting gear: risk assessment, technical file, notified body where required, and a plan for the Machinery Regulation that applies from 20 January 2027.
From $800Consultancy and notified body package

- Accredited by IAB and INTAQS
- Issuing certificates since 2004
- Online or on-site audits worldwide
- Verify any EUROTECH certificate
What machinery CE marking includes
Machinery placed on the EU market must meet the essential health and safety requirements of the Machinery Directive 2006/42/EC. From 20 January 2027 the Machinery Regulation (EU) 2023/1230 replaces it. The directive covers machines, interchangeable equipment, safety components, lifting accessories, chains, ropes and webbing, removable mechanical transmission devices and partly completed machinery.
Lifting equipment gets particular attention because of its risk. Cranes, hoists, lifting accessories and machines that lift people carry specific essential requirements, such as working coefficients, static and dynamic test coefficients, and marking of the maximum working load.
The core of machinery CE marking is the risk assessment. The manufacturer must identify every hazard the machine presents through its life, from transport and installation to use, cleaning, maintenance and dismantling, then reduce each risk in the right order: inherently safe design first, then guards and protective devices, then information for users.
- Classification: machine, partly completed machinery, lifting accessory or safety component
- Risk assessment to EN ISO 12100 and the relevant type C standards
- Review of safety functions and control systems
- Electrical equipment check to EN 60204-1 where it applies
- Technical file, instructions, EU Declaration of Conformity or Declaration of Incorporation
- Notified body involvement for annex-listed machines where required
The options: self-declaration, notified body or partly completed machinery
Most machinery is CE marked through internal checks by the manufacturer. Machines listed in the annex of high-risk categories, such as certain woodworking machines, presses, vehicle lifts or devices for lifting persons with a risk of falling, follow a stricter route. If they are built fully to harmonised standards, the manufacturer may still self-declare in many cases; if not, a notified body must take part through type examination or a full quality assurance assessment.
Partly completed machinery, meaning equipment that cannot perform a specific application on its own and is meant to be built into a larger machine, does not carry the CE mark under the Machinery Directive. Instead the manufacturer issues a Declaration of Incorporation and assembly instructions. Getting this classification wrong is one of the most frequent errors we see.
Under the new Machinery Regulation the list of high-risk machinery changes and some categories, such as certain safety components with self-evolving behaviour, will need a third-party assessment. If your machine will be placed on the market after 20 January 2027, plan for the regulation now.
What decides the price
Machinery CE packages start at $800, including notified body fees where your machine needs a notified body.
- Machine size and complexity, from a single workstation to a production line
- High-risk annex listing and the conformity route
- Safety functions to validate, such as light curtains, interlocks and emergency stops
- Other legislation in scope, such as EMC, ATEX or outdoor noise
- Lifting functions that need load testing evidence
- Documentation available: drawings, schematics and manuals
We confirm the price after reviewing the machine description, layout drawings and control schematics, and list everything in a written quote.
Instructions are often underestimated. A machinery manual must cover transport, installation, commissioning, normal use, cleaning, maintenance, residual risks and the protective equipment users need, and writing it well takes time. We review it against the essential requirements so it supports the risk assessment rather than contradicting it.
How CE marking for machinery works with us

Step 1
Directive and standard check
We classify the product and confirm the conformity route under the directive or the new regulation.

Step 2
Testing with an accredited lab
Load tests, electrical checks or noise measurements are coordinated where the machine needs them.

Step 3
Technical file and risk assessment
We run the risk assessment with your engineers and build the file and instructions.

Step 4
Notified body and market
For annex-listed machines we involve a notified body; then you sign the declaration.
Building for the European market
We support machine builders in the USA, Europe, Asia and Africa. Machines designed to North American practice often need changes before CE marking: European guarding and safety distance standards, emergency stop categories, control system performance levels to EN ISO 13849-1, electrical equipment to EN 60204-1 and instructions in the user's language.
Integrators who combine several machines into a line become the manufacturer of the assembly and must carry out their own risk assessment and CE marking for it. If you buy partly completed machinery from suppliers, their Declarations of Incorporation and assembly instructions are part of your evidence.
Lifting equipment users in the EU also have duties under national rules for periodic inspection, which are separate from CE marking at the point of sale. Tell us how the equipment will be used, so the instructions cover inspection and maintenance clearly.
Noise is another common gap. Machines must declare their noise emission values in the instructions, and outdoor equipment may also fall under the outdoor noise directive with its own marking.
What to expect
The project starts with the machine: layout, functions, operating modes, foreseeable misuse and the people who will work with it. We then run the risk assessment with your engineers, because they know the machine best, and record each hazard and the measures taken.
Safety functions are reviewed against the required performance level and validated. Where testing is needed, for example load tests for lifting functions, noise measurement or electrical checks, we coordinate it. The technical file, instructions and declaration follow.
For lifting equipment, expect evidence of static and dynamic load tests, the working coefficient used for chains, ropes or webbing, and the marking of the maximum working load on the machine and its accessories. These are checked before the declaration is signed.
If a notified body is needed, we submit the file and handle questions. The conformity decision stays with the manufacturer or the notified body as the legislation requires.
After CE marking: modifications and the 2027 change
A substantial modification to a machine already in service can make the person who modifies it a manufacturer, with a new CE marking duty. Before upgrading or rebuilding machines, check whether the change creates new hazards or increases existing risks beyond what the original assessment covered.
From 20 January 2027 machinery placed on the market must meet the Machinery Regulation (EU) 2023/1230. It brings changes to digital instructions, cybersecurity of control systems, collaborative and autonomous machines, and the list of high-risk categories. We can review an existing technical file against the regulation and list what to update before that date.
Keep the risk assessment as a living document. When users report incidents or near misses, or when you add an option to the machine, review whether the assessment and the instructions still match the machine as sold.
How this service works: most machines are CE marked under the manufacturer's own declaration. Machines listed in the high-risk annex may need a notified body; where they do, we arrange it and include the fees in your package. EUROTECH is not a notified body.
Questions buyers ask
When does the Machinery Regulation replace the Machinery Directive?
Regulation (EU) 2023/1230 applies from 20 January 2027. Machinery placed on the EU market from that date must meet it.
Does my machine need a notified body?
Only if it is in the high-risk annex and not built fully to harmonised standards, or where the new regulation requires third-party assessment. Most machines are self-declared.
What is partly completed machinery?
Equipment that cannot do a specific job on its own and is meant to be built into a machine. It gets a Declaration of Incorporation, not a CE mark under the directive.
How much does CE marking for machinery cost?
Our packages start at $800, including notified body fees where needed. Machine complexity, safety functions and testing set the final price.
We combine machines into a line. Do we need to CE mark it?
Usually yes. An integrator who creates an assembly of machines becomes its manufacturer and must CE mark the assembly.
Which standards are used most?
EN ISO 12100 for risk assessment, EN ISO 13849-1 for safety-related control systems, EN 60204-1 for electrical equipment, plus type C standards for specific machines.
Related services
- CE marking
From $800
- CE marking for electrical equipment
From $800
- PED certification for pressure equipment
From $800
Get a quote for CE marking for machinery
Tell us your company, sites and the standard you need. We reply with a written quote and the audit plan.
Prefer to talk? Call +1 307 205 1833
Monday to Friday, 09:00 to 18:00 (US Mountain Time)
